An introduction to the city's framework for rentals of 29 consecutive days or fewer. Always verify current requirements with the City before making a purchase decision.

Approval is never automatic. Being in a mapped area, having a prior permit, or meeting the criteria below does not ensure a new application will be approved. City rules and fees can change.

01 / Permit paths

Two distinct pathways

The guide distinguishes Short-Term Lodging Units (STLUs) from Short-Term Apartment Rentals (STARs). Your property's classification matters; ask Planning which path, if any, applies.

STLU

Short-Term Lodging Unit

Generally applies to qualifying condos, multifamily units, and certain mixed-use properties in designated overlay areas. The guide notes a 20% building-unit permit cap and no primary-residence requirement.

STAR

Short-Term Apartment Rental

A separate pathway for qualifying multifamily structures under single ownership. The guide notes an on-site primary-residence requirement for the owner or trained manager and a 300-foot separation rule.

02 / Geography & ownership

A mapped area is not a permit.

Potential STLU areas in the guide include select parcels around the Pier Bowl, downtown, North Beach, and South El Camino Real. Low-density RL/R1 single-family neighborhoods are described as ineligible for STLUs. Boundaries and parcel details should be checked against the official city map and confirmed with Planning.

Existing permits do not transfer to a buyer at closing. Condo and multifamily buyers also need to check the 20% active-permit cap, review HOA CC&Rs, and obtain required HOA authorization.

03 / Approval sequence

Plan for the gap after closing.

The guide estimates 60–90 days after closing before operations may begin, but timing is not guaranteed. Do not advertise or operate until all required approvals are final.

1.

Apply for zoning approval

Submit the City's application with plans, parking proof, narrative, and applicable HOA consent. The guide lists a $140 STLU fee and a 30–60 day review estimate; the STAR permit fee is listed at $536.

2.

Notify neighbors

Following conditional approval, the guide describes notice to property owners within 300 feet and a 30-day compliance window.

3.

Obtain the operating license

Submit the operating-license application with required documentation and tax setup. The guide lists a $105 initial/annual fee and a 14–30 day review estimate.

04 / Operating standards

Once approved, the rules continue.

Guest occupancy

The guide states two people per bedroom plus two, up to a maximum of 12 overnight guests.

Parking

Legal, accessible off-street stalls must measure at least 9 × 19 feet; street parking does not satisfy the requirement.

Local contact

A designated 24/7 contact must be able to arrive on site within 30 minutes when called by enforcement or law enforcement.

No events

Weddings, parties, retreats, and commercial gatherings are not permitted under the lodging use described in the guide.

Transient occupancy tax

The guide identifies a 10% tax on gross guest charges, with quarterly returns—including zero-income quarters.

One rental contract

The guide describes one rental contract at a time, not simultaneous leases to independent groups.

Go to the source

Review the City of San Clemente's current STLU materials and contact Planning for parcel-specific guidance. This summary is drawn from the supplied investment guide, not a City determination.